Submarines, destroyers, cutters and shipyard rebuilds are funded, contracted and in some cases already on the ways. Execution depends on whether facilities, suppliers, schedules and skilled trades line up at the same time. Here is what the evidence shows, and what it means for workforce planning.
The U.S. maritime industrial base is carrying a full order book. Virginia-class and Columbia-class submarines and DDG 51 destroyers are under construction. The Coast Guard is building Offshore Patrol Cutters and its lead Polar Security Cutter, and has reported contracts for 11 Arctic Security Cutters. The Navy is building new dry docks at its public shipyards.
The next phase is harder to measure than funding. Budgets and contracts show intent. Delivered ships, completed maintenance periods and operating dry docks show execution.
Between the two sits a chain of dependencies: infrastructure, suppliers, materials, production schedules and the skilled trades who do the work. When any link is out of step with the others, schedules move.
So is the industrial base ready to execute? The answer depends on which program, which shipyard, which supplier and which phase of work. This article looks at a small set of current programs, what government auditors and analysts have documented about their progress, where capacity is being strengthened, and what that means for workforce planning.
Program status matters, because "planned" and "in production" create very different labor demand. A few current examples show the range.
Virginia-class attack submarines: in production. Virginia-class boats are being built under contract by General Dynamics Electric Boat and HII Newport News Shipbuilding. Congress's enacted FY2026 defense appropriations included $1.9 billion to fully fund a second Virginia-class submarine that year. GAO reported in April 2026 that shipbuilders were delivering at about one boat per year as of June 2025, half the Navy's goal of two, and that both 2025 deliveries were more than three years late.
Columbia-class ballistic missile submarines: under construction. The Navy plans 12 Columbia-class boats. The first was procured in FY2021 and the second in FY2024, according to CRS. GAO reported in April 2026 that the lead boat was at least 18 months behind its contract delivery date. One more Columbia-class boat appears in the Navy's FY2027 budget request, which is a proposal, not enacted funding.
DDG 51 Arleigh Burke-class destroyers: in production. GAO reported that delays on Flight III destroyers had grown to between 22 and 58 months. The FY2026 appropriations act added $1.0 billion for a third DDG 51 and included $300 million for DDG 51 wage enhancements, according to the Senate Appropriations Committee summary.
Navy maintenance: ongoing, with documented backlogs. In December 2025, CBO found that maintenance on conventional Navy ships often takes 20 to 100 percent longer than the Navy's final schedules. In April 2026 testimony, CBO reported that 33 percent of the attack submarine fleet was undergoing or awaiting maintenance, against a Navy preference of no more than 20 percent. GAO's August 2026 review linked lost submarine operational days in part to limited dry dock capacity.
Coast Guard recapitalization: contracted and under construction. GAO's April 2026 report described a delay of more than five years for delivery of the lead Offshore Patrol Cutter and a nine-year delay for the lead Polar Security Cutter. GAO also noted the Coast Guard reported awarding contracts worth up to $6.8 billion to build 11 Arctic Security Cutters.
What comes next: requested, not yet enacted. The Navy's FY2027 budget request, released April 21, 2026, seeks $65.8 billion for shipbuilding to buy 34 ships, including one Columbia-class and two Virginia-class submarines. That is a request. It describes future workload, not current production.
Workforce implication: Contracted and in-production work drives labor demand now. Requested work signals what may follow. A workforce plan should keep the two in separate columns.
It is tempting to measure industrial base readiness by counting shipyards or dry docks. Execution depends on a wider system.
Physical capacity. GAO reported in February 2025 that representatives from four of the seven shipbuilders building Navy battle force ships said they have constrained physical space, and that some face aging facilities and equipment.
Production capacity. CBO testified in April 2026 that naval tonnage under construction grew 80 percent from 2014 to 2024, from 68,000 tons to 123,000 tons, and that shipyards now need 9 to 10 years on average to build destroyers. More work is in the yards at once, and each ship is in the yard longer.
Supply-chain capacity. Prime shipyards depend on suppliers for castings, forgings, valves, pumps, electrical systems and other components. CBO reported that about 70 percent of suppliers of critical submarine components have no competitors. GAO stated that "many suppliers also have workforce and infrastructure problems that could result in challenges to their ability to produce quality materials on time." For the Columbia program, GAO's June 2025 assessment, as quoted by CRS, noted limited workforce and industrial capacity at component suppliers and said qualifying new suppliers can take years.
Workforce capacity. GAO's April 2026 report identified challenges training, recruiting and retaining trades workers such as welders, pipefitters and machinists. CBO testified that voluntary attrition at Bath Iron Works and Electric Boat was below 10 percent a year, while workforces at many yards are "overall, less experienced than they were" previously.
Execution capacity. GAO's overall conclusion in April 2026 was that none of the seven shipbuilders building battle force ships was positioned to meet the Navy's delivery goals at the time of its review. GAO linked shipyard capacity shortfalls "in part" to infrastructure and workforce limitations, and also pointed to program management practices.
That last point matters. GAO did not describe workforce as the only constraint, and it did not describe every yard or supplier as constrained in the same way. The findings are specific to the programs, yards and suppliers reviewed.
Workforce implication: Adding a dry dock or a building bay adds potential. Turning that potential into delivered work also requires materials on time, a schedule that holds, and enough qualified trades at the yard and at its suppliers.
| Dimension | Question to Ask |
|---|---|
| Infrastructure | Are the facilities and equipment available? |
| Supply Chain | Can suppliers and subcontractors support the workload? |
| Production | Can schedules, processes and resources support execution? |
| Workforce | Are the necessary skills available when the work reaches production? |
| Timing | Are all four aligned with actual program milestones? |
How to use it: Review each upcoming milestone against all five dimensions. A gap in any one can affect the others.
The documented challenges are only half the picture. Significant investment is in motion, at different stages.
Public shipyard infrastructure (underway, long-term). The Navy's Shipyard Infrastructure Optimization Program (SIOP), created in 2018, covers the four public naval shipyards: Norfolk, Portsmouth, Pearl Harbor and Puget Sound. GAO reported in September 2026 that new dry docks are under construction at Portsmouth and Pearl Harbor and in final design at Puget Sound, at a combined estimated cost of about $21.7 billion. As of April 2026, the Navy had completed or begun about 100 SIOP construction projects. GAO expects total program costs to surpass $200 billion over 50 years or more.
Submarine industrial base (funded, ongoing). GAO reported that DOD has invested more than $10 billion in the submarine industrial base since FY2018, and that OSD invested over $150 million in FY2025 under its submarine industrial base technology priority. The enacted FY2026 appropriations act included another $285 million for the submarine maritime industrial base. GAO has also recommended that DOD assess the full cost and schedule of the investments still needed to reach one Columbia-class and two Virginia-class boats per year.
Wages and retention (funded). GAO reported that an April 2025 modification to the Virginia-class Block V contract included funding for wage enhancements to improve worker retention, and that shipbuilder representatives described a positive effect on recruiting and retention. The FY2026 appropriations act included $300 million for DDG 51 wage enhancements.
Small shipyards (awarded). In August 2026, MARAD awarded $35.1 million in Small Shipyard Grants to 45 shipyards in 24 states and the U.S. Virgin Islands. Funded projects include floating dry docks, marine cranes, welding machines, plasma cutting tables and maritime worker training programs.
Training pipelines (operating). The Navy-funded Accelerated Training in Defense Manufacturing (ATDM) program in Danville, Virginia, runs a 600-hour, roughly four-month program in additive manufacturing, CNC machining, non-destructive testing, quality control inspection and metrology, and welding. Its stated purpose is preparing adult learners to work in the submarine industrial base.
Workforce implication: Many of these investments reach suppliers and smaller yards, not only prime shipyards. As they come online, they will draw on the same regional pools of welders, machinists, pipefitters and electricians.
Workforce readiness is not the whole execution story. It is the part that takes the longest to change.
A dry dock can be designed, funded and built on a known schedule. A skilled tradesperson takes longer to develop than most hiring plans assume. GAO reported that shipbuilder documentation puts proficiency in the skilled trades at 3 to 5 years. Training programs such as ATDM shorten the path to entry-level readiness. They do not replace the experience that comes from years on the deck plate.
Several practical factors shape how workforce readiness affects execution:
None of this proves a shortage at any given yard. It does mean workforce availability should be tracked with the same discipline as material availability and facility readiness.
Workforce implication: Labor is one of several execution constraints, and the one with the longest lead time. It belongs in program planning from the start.
The most useful workforce plans start from what is actually on the schedule, not from headlines about total shipbuilding budgets.
For shipyard, ship repair and supplier leaders, a few questions help translate program status into workforce action:
Programs that are moving forward create planning visibility. Leaders who use that visibility early have more options when the work arrives.
Consider your next 12 to 24 months:
Programs move from contract to production on milestones you can see in advance. NSC Marine supports shipbuilding, conversion and repair work with skilled trades including welders, shipfitters, pipefitters, electricians, fabricators, blaster/painters, riggers and firewatch. If you are mapping labor needs against upcoming production or availability dates, we can help you think through which trades you will need and when.
Explore Marine Staffing Request TalentThe maritime industrial base includes public and private shipyards, repair facilities, suppliers, subcontractors, fabricators, equipment manufacturers and the skilled workforce and training pipelines that support them. Delivering ships and completing maintenance depends on all of these parts working on aligned schedules.
As of 2025 and 2026 sources, Virginia-class and Columbia-class submarines, DDG 51 destroyers, the Offshore Patrol Cutter and the Polar Security Cutter are under construction, and the Coast Guard reported contracts for 11 Arctic Security Cutters. Additional ships in the Navy's FY2027 budget are requested, not yet funded.
GAO's April 2026 report found that none of the seven shipbuilders building Navy battle force ships was positioned to meet the Navy's delivery goals at the time of review. It attributed capacity shortfalls in part to infrastructure and workforce limitations and noted that many suppliers face workforce and infrastructure problems.
Yes. GAO reported that DOD has invested more than $10 billion in the submarine industrial base since FY2018, and the FY2026 appropriations act included $285 million for the submarine maritime industrial base. GAO has recommended DOD assess the full cost and schedule of the investments still needed.
Start with work that is contracted or scheduled, forecast labor by trade and production phase, and identify where programs overlap. Because GAO reports skilled trades take 3 to 5 years to reach proficiency, recruiting and training for critical trades should begin well before production peaks.